While most of the students are away from West Virginia University during the summer, the WVU Facilities Management team is hard at work during its busiest season.
The summer months see many hours of effort spent on repairing and upgrading the campus. From repainting dorms to rebuilding White Hall, there are hundreds of different projects going on during the summer as WVU nears the fall semester. Many of these tasks are basic campus maintenance jobs that the Facilities Management team is proud to complete without the students noticing.
Here is a peek at a few of the larger projects under way around campus this summer:
A broader list of the work around campus:
Projects | Type | Number/Areas |
---|---|---|
CTEC classroom renovations | General Scheduled |
|
Carpet replacement | Offices, dorms, Rec Center, ENG, Mineral Resources Building | Multiple |
Room painting | Offices, dorms, exterior fixtures | Multiple |
Woodburn Hall exterior restoration | roofs, soffit fascia, gutters, stonework, steps, painting | |
E. Moore Hall exterior restoration | roofs, soffit fascia, gutters, stonework, steps, painting | |
Building roof replacements | Eiesland, Press Box, Mountainlair partial, Coliseum lower roofs | 10 roofs |
Wallpaper replacements | Fieldcrest, Mountainlair | |
Mountainlair | Ballroom lights and ceiling, bowling alley ceiling, 2nd floor ceilings and lighting, 1st floor replacement flooring |
|
Mountainlair | remodel restaurant space | 1 |
General Woodworking | Several buildings demolished for future development | 5 buildings |
1st Street building demo | Two residences demolished for future development | 2 buildings |
HVAC upgrades/repairs/replacement | Clark, Percival, CAC Rec Center, Evansdale Residential Complex, Fieldcrest | multiple |
Laboratory renovations or construction | Clark, Chemistry Annex, Life Sciences, Engineering, NRCCE | multiple |
Basketball Practice Facility | ||
White Hall renovations | ||
Office Space, area renovations | B&E, Mountainliar, Engineering, various | more than 30 areas |
Marina Tower renovations | Office space development | 2 Floors |
New Art Museum renovation | Convert old Alumni Center, gut building and refit | building wide |
Boreman Hall North | New bathroom renovation with new windows/showers | 4 floors |
Campus wide emergency lighting upgrade | various buildings | multiple |
Laboratory renovations or construction | Clark, Chemistry Annex, Life Sciences, Engineering, NRCCE | multiple |
Sidewalk repairs, lighting | Residence hall areas, CAC parking lot, Evansdale Residential Complex, Arnold, College Ave. | multiple areas |
Mountalinlair | Information Desk area | |
Time Clocks for new system | Entire campus | 70 locations |
Small electrical jobs | various buildings | more than 30 areas |
Airport hangar | replacement of hangar doors | |
Chem Research, Fieldcrest | backup generator | multiple |
CAC | Ground floor locker replacement | |
Life safety roof tie-offs | various buildings | multiple areas |
Eiesland Hall | fire suppression system design and install | |
Chemistry Annex | building exhaust system replacement | |
Chemistry Annex | Air handler | |
Chesnut Ridge Research Building | several floors renovated | |
Deferred projects | multiple area | |
By Joey Machak
and
Scott Lituchy
WVU News and Information
-WVU-
jmsl/07/22/10
CONTACT: News and Information, 304-293-6997
Follow @WVUToday on Twitter.