While most of the students are away from West Virginia University during the summer, the WVU Facilities Management team is hard at work during its busiest season.

The summer months see many hours of effort spent on repairing and upgrading the campus. From repainting dorms to rebuilding White Hall, there are hundreds of different projects going on during the summer as WVU nears the fall semester. Many of these tasks are basic campus maintenance jobs that the Facilities Management team is proud to complete without the students noticing.

Here is a peek at a few of the larger projects under way around campus this summer:

splash
A broader list of the work around campus:
Projects Type Number/Areas
CTEC classroom renovations General Scheduled
21
Carpet replacement Offices, dorms, Rec Center, ENG, Mineral Resources Building Multiple
Room painting Offices, dorms, exterior fixtures Multiple
Woodburn Hall exterior restoration roofs, soffit fascia, gutters, stonework, steps, painting
E. Moore Hall exterior restoration roofs, soffit fascia, gutters, stonework, steps, painting
Building roof replacements Eiesland, Press Box, Mountainlair partial, Coliseum lower roofs 10 roofs
Wallpaper replacements Fieldcrest, Mountainlair
Mountainlair Ballroom lights and ceiling, bowling alley ceiling, 2nd floor ceilings and lighting, 1st floor replacement flooring
7
Mountainlair remodel restaurant space 1
General Woodworking Several buildings demolished for future development 5 buildings
1st Street building demo Two residences demolished for future development 2 buildings
HVAC upgrades/repairs/replacement Clark, Percival, CAC Rec Center, Evansdale Residential Complex, Fieldcrest multiple
Laboratory renovations or construction Clark, Chemistry Annex, Life Sciences, Engineering, NRCCE multiple
Basketball Practice Facility
White Hall renovations
Office Space, area renovations B&E, Mountainliar, Engineering, various more than 30 areas
Marina Tower renovations Office space development 2 Floors
New Art Museum renovation Convert old Alumni Center, gut building and refit building wide
Boreman Hall North New bathroom renovation with new windows/showers 4 floors
Campus wide emergency lighting upgrade various buildings multiple
Laboratory renovations or construction Clark, Chemistry Annex, Life Sciences, Engineering, NRCCE multiple
Sidewalk repairs, lighting Residence hall areas, CAC parking lot, Evansdale Residential Complex, Arnold, College Ave. multiple areas
Mountalinlair Information Desk area
Time Clocks for new system Entire campus 70 locations
Small electrical jobs various buildings more than 30 areas
Airport hangar replacement of hangar doors
Chem Research, Fieldcrest backup generator multiple
CAC Ground floor locker replacement
Life safety roof tie-offs various buildings multiple areas
Eiesland Hall fire suppression system design and install
Chemistry Annex building exhaust system replacement
Chemistry Annex Air handler
Chesnut Ridge Research Building several floors renovated
Deferred projects multiple area

By Joey Machak
and
Scott Lituchy
WVU News and Information

-WVU-

jmsl/07/22/10

CONTACT: News and Information, 304-293-6997

Follow @WVUToday on Twitter.